Everything done so far has been in the pursuit of two basic goals: Create an aerobic environment for optimal waste digestion and water quality Provide beneficial bio-enzymes and microbes for wastewater treatment and solids digestion Now that the equipment has been installed, it must to utilized as part of a program in order to achieve
Now that the system layout has been designed, the equipment procured, and the lagoons and site are prepared, it’s time to deliver the equipment and install the aeration system. Delivery If we are assisting you in the installation of your system, we will deliver the equipment ourselves. If you need a boat, we can supply